Fittz & Shipman, Inc. performed the civil and structural engineering design for the foundation and steel framing for the $50 million facility. Civil Design included grading, drainage, paving and utilities design for the 50 acre site. Concrete parking areas, practice fields for football/soccer field, competition baseball and softball fields, tennis courts, and open areas were included in the site design. Fittz & Shipman also performed topographic surveying and hydraulics and hydrology for drainage design as well as all water and waste water utilities.