Fittz & Shipman, Inc. performed the boundary & topographic survey of 26 acre site. Using the survey data F&S then performed all of the civil engineering design for the $44 Million project. This work included design of a 4 lane entry boulevard, parking areas, site grading for football stadium & parking areas, drainage computations, storm sewer design and detention facilities. The work also included design for some of the adjacent commercial tracts including extension of sanitary sewer lines and water lines to the site and design of a water line loop with fire hydrants. Work also entailed the design and permitting for boring of water, sewer lines under existing pipelines and railroad tracks.